Which of the following would an IS auditor consider to be
the MOST important when evaluating an organization's IS
strategy? That it:
A. has been approved by line management.
B. does not vary from the IS department's preliminary budget.
C. complies with procurement procedures.
D. supports the business objectives of the organization.
Answer / guest
Strategic planning sets corporate or department objectives
into motion. Both long-term and short-term strategic plans
should be consistent with the organization's broader plans
and business objectives for attaining these goals. Answer A
is incorrect since line management prepared the plans.
Is This Answer Correct ? | 5 Yes | 3 No |
Which of the following protocols would be involved in the implementation of a router and interconnectivity device monitoring system? A. Simple network management B. File transfer C. Simple Mail Transfer Protocol D. Telnet
Which of the following is the MOST likely reason why e-mail systems have become a useful source of evidence for litigation? A. Multiple cycles of backup files remain available. B. Access controls establish accountability for e-mail activity. C. Data classification regulates what information should be communicated via e-mail. D. Within the enterprise, a clear policy for using e-mail ensures that evidence is available.
Which of the following methods of providing telecommunication continuity involves routing traffic through split- or duplicate-cable facilities? A. Diverse routing B. Alternative routing C. Redundancy D. Long haul network diversity
Access rules normally are included in which of the following documentation categories? A. Technical reference documentation B. User manuals C. Functional design specifications D. System development methodology documents
Which of the following goals would you expect to find in an organization's strategic plan? A. Test a new accounting package. B. Perform an evaluation of information technology needs. C. Implement a new project planning system within the next 12 months. D. Become the supplier of choice within a given time period for the product offered.
A hub is a device that connects: A. two LANs using different protocols. B. a LAN with a WAN. C. a LAN with a metropolitan area network (MAN). D. two segments of a single LAN.
An IS auditor who is reviewing application run manuals would expect them to contain: A. details of source documents. B. error codes and their recovery actions. C. program logic flowcharts and file definitions. D. change records for the application source code.
The most common reason for the failure of information systems to meet the needs of users is that: A. user needs are constantly changing. B. the growth of user requirements was forecast inaccurately. C. the hardware system limits the number of concurrent users. D. user participation in defining the system's requirements was inadequate.
When implementing and application software package, which of the following presents the GREATEST risk? A. Uncontrolled multiple software versions B. Source programs that are not synchronized with object code C. Incorrectly set parameters D. Programming errors
Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review
An organization is considering connecting a critical PC-based system to the Internet. Which of the following would provide the BEST protection against hacking? A. An application-level gateway B. A remote access server C. A proxy server D. Port scanning
To check the performance of flow and error control, an IS auditor should focus the use of a protocol analyzer on which of the following layers? A. Network B. Transport C. Data link D. Application