Which of the following development methods uses a prototype
that can be updated continually to meet changing user or
business requirements?

A. Data-oriented development (DOD)

B. Object-oriented development (OOD)

C. Business process reengineering (BPR)

D. Rapid application development (RAD)



Which of the following development methods uses a prototype that can be updated continually to meet..

Answer / guest

Answer: D

Only RAD uses prototyping as its core development tool. OOD
and DOD use continuously developing models, and BPR attempts
to convert an existing business process rather than make
dynamic changes.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

The BEST method of proving the accuracy of a system tax calculation is by: A. detailed visual review and analysis of the source code of the calculation programs. B. recreating program logic using generalized audit software to calculate monthly totals. C. preparing simulated transactions for processing and comparing the results to predetermined results. D. automatic flowcharting and analysis of the source code of the calculation programs.

2 Answers  


A control that detects transmission errors by appending calculated bits onto the end of each segment of data is known as a: A. reasonableness check. B. parity check. C. redundancy check. D. check digits.

2 Answers  


Which of the following should be in place to protect the purchaser of an application package in the event that the vendor ceases to trade? A. Source code held in escrow. B. Object code held by a trusted third party. C. Contractual obligation for software maintenance. D. Adequate training for internal programming staff.

1 Answers  


During a review of a business continuity plan, an IS auditor noticed that the point at which a situation is declared to be a crisis has not been defined. The MAJOR risk associated with this is that: A. assessment of the situation may be delayed. B. execution of the disaster recovery plan could be impacted. C. notification of the teams might not occur. D. potential crisis recognition might be delayed.

1 Answers  


Access rules normally are included in which of the following documentation categories? A. Technical reference documentation B. User manuals C. Functional design specifications D. System development methodology documents

1 Answers  






The PRIMARY objective of a business continuity and disaster recovery plan should be to: A. safeguard critical IS assets. B. provide for continuity of operations. C. minimize the loss to an organization. D. protect human life.

2 Answers  


Which of the following is a strength of a client-server security system? A. Change control and change management procedures are inherently strong. B. Users can manipulate data without controlling resources on the mainframe. C. Network components seldom become obsolete. D. Access to confidential data or data manipulation is controlled tightly.

2 Answers  


When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.

1 Answers  


When conducting an audit of client/server database security, the IS auditor would be MOST concerned about the availability of: A. system utilities. B. application program generators. C. system security documentation. D. access to stored procedures.

2 Answers  


Which is the first software capability maturity model (CMM) level to include a standard software development process? A. Initial (level 1) B. Repeatable (level 2) C. Defined (level 3) D. Optimizing (level 5)

1 Answers  


During a post-implementation review of an enterprise resource management system, an IS auditor would MOST likely: A. review access control configuration. B. evaluate interface testing. C. review detailed design documentation. D. evaluate system testing.

2 Answers  


Disaster recovery planning addresses the: A. technological aspect of business continuity planning. B. operational piece of business continuity planning. C. functional aspect of business continuity planning. D. overall coordination of business continuity planning.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)