Which of the following is a network architecture
configuration that links each station directly to a main hub?
A. Bus
B. Ring
C. Star
D. Completed connected
Answer / guest
Answer: C
A star network architecture configuration links each station
directly to a main hub. Bus configurations link all stations
along one transmission medium, ring configurations attach
all stations to a point on a circle and completely connected
configurations provide a direct link between two host machines.
Is This Answer Correct ? | 3 Yes | 0 No |
Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review
Which of the following concerns associated with the World Wide Web would be addressed by a firewall? A. Unauthorized access from outside the organization B. Unauthorized access from within the organization C. A delay in Internet connectivity D. A delay in downloading using file transfer protocol (FTP)
The FIRST task an IS auditor should complete when performing an audit in an unfamiliar area is to: A. design the audit programs for each system or function involved. B. develop a set of compliance tests and substantive tests. C. gather background information pertinent to the new audit. D. assign human and economical resources.
Which of the following would an IS auditor consider a weakness when performing an audit of an organization that uses a public key infrastructure with digital certificates for its business-to-consumer transactions via the Internet? A. Customers are widely dispersed geographically, but not the certificate authorities. B. Customers can make their transactions from any computer or mobile device. C. The certificate authority has several data processing subcenters to administrate certificates. D. The organization is the owner of the certificate authority.
Change management procedures are established by IS management to: A. control the movement of applications from the test environment to the production environment. B. control the interruption of business operations from lack of attention to unresolved problems. C. ensure the uninterrupted operation of the business in the event of a disaster. D. verify that system changes are properly documented.
A LAN administrator normally would be restricted from: A. having end-user responsibilities. B. reporting to the end-user manager. C. having programming responsibilities. D. being responsible for LAN security administration.
An organization acquiring other businesses continues using its legacy EDI systems, and uses three separate value added network (VAN) providers. No written VAN agreements exist. The IS auditor should recommend that management: A. obtain independent assurance of the third party service providers. B. set up a process for monitoring the service delivery of the third party. C. ensure that formal contracts are in place. D. consider agreements with third party service providers in the development of continuity plans.
Which of the following would BEST ensure continuity of a wide area network (WAN) across the organization? A. Built-in alternative routing B. Full system backup taken daily C. A repair contract with a service provider D. A duplicate machine alongside each server
Which of the following is the MOST reliable sender authentication method? A. Digital signatures B. Asymmetric cryptography C. Digital certificates D. Message authentication code
A strength of an implemented quality system based on ISO 9001 is that it: A. guarantees quality solutions to business problems. B. results in improved software life cycle activities. C. provides clear answers to questions concerning cost-effectiveness. D. does not depend on the maturity of the implemented quality system.
The IS department of an organization wants to ensure that the computer files, used in the information processing facility, are backed up adequately to allow for proper recovery. This is a/an: A. control procedure. B. control objective. C. corrective control. D. operational control.
Which of the following is the MOST critical element of an effective disaster recovery plan (DRP)? A. Offsite storage of backup data B. Up-to-date list of key disaster recovery contacts C. Availability of a replacement data center D. Clearly defined recovery time objective (RTO)