Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What are the different methods for drawing an arc?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
Define relative co-ordinates?
how to estimate material requirement for an area of house in square feet?
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
how much of the strength comes from post-production curing
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
Why should you show Client/Engineer activities clearly on the project plan?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
What is the Unit weight of coarse sand (F.M- 2.20) ?????
door and window wood work calculations and different methods
What is braced excavation all about?
what are RIB slabs explain about it