You want to insert an inspection check point at the end of an operation. How would you do that?
1089Post New SAP PP (Production Planning) Questions
Differentiate ‘variant bom’ from ‘multiple bom’?
Difference between standard cost and variable cost.
What is the standard info set?
What is Auto GR?
What are the t-codes for creating, changing and summarizing bom?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is planning horizon?
Explain Planning file entry.
what is the major ticket in your experience
Explain what is the need of mrp list if the stock requirement list is already given?
How to attach a drawing for a material to bom ? Is it possible ?
Different types of consumption based planning.
In implementation stage tell some standard scenario before AS-Is & TO-BE
Explain PI sheet.
What is time phased Planning?