What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?
1472We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
1076What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
1195Post New SAP PP (Production Planning) Questions
How to attach a drawing for a material to bom ? Is it possible ?
What is Phantom Assembly?
What is pi sheet
Mention what is the production process in sap?
What is MRP Profile and MRP Group?
Mention what are the t-codes for creating, changing and summarizing bom?
Integration between PP and PM module.
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is MTS and MTO and the difference between them?
What is 'capacity planning'?
Can we have more than 6 standard values in standard value key?
How to move to the realization phase?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Difference between Item categories or what is variable size item or non stock item.
Can't one material be assigned to more than one operation in a routing?