What is qualification deficiency?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Splitting of production order & product version
How are time management and payroll are integrated?
What are the reports generated in product cost controlling information system?
What are traffic lights in mrp?
What is 'capacity planning'?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
Integration between PP and PM module.
What are the levels of batch, explain batch determination process?
How do you get the system to update this value from the routing?
How do I default it 41?
In lsmw which is most important step?
How does sap know that an operation has components as indicated by the component allocation indicator?