Design Patterns (211)
UML (234)
OOAD (384)
Software Design Tools (25)
Requirements Management (46)
Project Planning (76)
Project Management (435)
Technical Writer (10)
DevOps (119)
MVC Model View Controller (306)
Software Design AllOther (65)
What are assertion facets used for in uml?
What are the elements which are utilized in the state chart diagram?
What is a friend function?
Which software is used for UML diagrams?
Differences between functional programming and object-oriented programming?
What is the difference between Activity and sequence diagrams?
Which is better mvc or mvvm?
What is lexi design pattern?
What are the key principles that underlie patterns?
Scope definition is necessary for all of the following reasons except: A. To subdivide project deliverables into smaller components B. To assess the stability of the project scope C. To facilitate time and cost estimates D. To facilitate responsibility and assignment
What are main benefits of using mvc?
Which of the following is true regarding the critical path? A. It should never be compressed. B. It allows for looping and branching. C. The critical path technique is the same as PERT. D. It's the duration of all tasks with zero float.
You are the project manager for a construction company that is building a new city and county office building in your city. You recently looked over the construction site to determine if the work to date was conforming to the requirements and quality standards. Which tool and technique of Quality Control are you using? A. Performance measurements B. Inspection C. Sampling D. Prevention
During contract negotiations, your vendor tells you that the equipment originally bid in the RFP is no longer available. They say the best solution is to buy the new equipment they're offering, which is a higher price than the original equipment. You have concerns that the new equipment might not be compatible with existing equipment and try to discuss this with them. They remind you that this decision was already made during the last contract negotiation meeting so there's no need to continue to discuss it. This is an example of which of the following? A. Proposal B. Compromise C. Storming D. Fair accomplish
What is an activity diagram?