Design Patterns (211)
UML (234)
OOAD (384)
Software Design Tools (25)
Requirements Management (46)
Project Planning (76)
Project Management (435)
Technical Writer (10)
DevOps (119)
MVC Model View Controller (306)
Software Design AllOther (65) Can you explain the difference between vector and raster graphics? When would you use one over the other in UI design?
1 503Describe a project where you had to solve a user experience issue in a creative way. What was the challenge, and how did you approach solving it?
1 520
Is flask an mvc model and if yes give an example showing mvc pattern for your application?
During your project meeting, a problem was discussed and a resolution to the problem was reached. During the meeting, the participants started wondering why they thought the problem was such a big issue. Sometime after the meeting, you received and e-mail from one of the meeting members saying they've changed their mind about the solution reached in the meeting and need to resurface the problem. The solution reached during the initial project meeting is an example of which of the following conflict resolution techniques? A. Confrontation B. Forcing C. Smoothing D. Storming
Explain the role of "actionfilters" in mvc?
What are the major configuration management tools in devops ?
The Project Management Knowledge Areas: A. Include Initiation, Planning, Executing, Controlling, and Closing B. Consist of nine different areas that bring together processes that have things in common C. Consist of five different processes that bring together phases of projects that have things in common D. Include Planning, Executing, and Controlling processes as these three processes are commonly interlinked
What are the functions of project management tool?
You are working on a project that was proceeding well until a manufacturing glitch occurred that requires corrective action. It turns out the glitch was an unintentional enhancement to the product, and the marketing people are absolutely crazy about its potential. The corrective action is canceled, and you continue to produce the product with the newly discovered enhancement. As the project manager, you know that a change has occurred to the product scope as the glitch changed the characteristics of the product. Which of the following is true? A. Changes to product scope are reflected in the project scope. B. Changes to product scope are reflected in the integrated change control plan. C. Changes to product scope are a result of changes to the product description. D. Changes to product scope are a result of corrective action.
What is mvc technology?
What are the relationships used in UML?
What is the difference between new and override?
What are the virtualization tools in devops ?
What is clean architecture?
What are structural design patterns?
what are the different ways for a method to be overloaded?
What is known as static diagrams?