Software Design Interview Questions
Questions Answers Views Company eMail

What is mvc programming?

1

Is angularjs mvvm or mvc 4?

1

Why is mvc needed?

1

What is the difference between mvc and mvp?

1

What is mvc mvp mvvm?

1

What is latest mvc version?

1

What is difference between mvvm and mvc?

1

What is mvc razor?

1

Why is mvc good?

1

Is angularjs mvvm or mvc?

1

What's the difference between mvc and mvp?

1

Is angular js mvc?

1

Is mvc a layered architecture?

1

What does model do in mvc?

1

Is mvc architecture or framework?

1


Un-Answered Questions { Software Design }

What is viewstate mvc?

1


What are action selectors in mvc?

1


What do you mean by DevOps?

5


What is difference between mvvm and mvc?

1


What are DevOps skills?

5






Your project selection committee used a weighted scoring model and found that Project B, with a score of 54, should be chosen over the other competing projects. Which of the following is true? A. Weighted scoring models are a benefit measurement method, which is a tool and technique in the Initiation process. B. Weighted scoring models are a constrained optimization method, which is an output of the Initiation process. C. Weighted scoring models are a constrained optimization method, which is a tool and technique in the Initiation process. D. Weighted scoring models are a benefit measurement method, which is an output of the Initiation process.

643


How do we represent private, public and protected in class diagrams?

491


How does kubernetes provide high availability of applications in a cluster?

1


The lowest level of the WBS is called what? A. Code of accounts B. Requirement C. Milestone D. Work package

609


You are the project manager for Zippy Tees. Your company has decided to outsource the manufacturing of miniature bears to be attached to your trendy T-shirts. Which of the following is true? A. A good product description is all that's required. The project manager will supply this to the vendor. B. The contract can serve as the project charter. The product description will be included in the contract. C. The project manager should write the project charter because the project manager will be managing the vendor portion of this project as well. D. The vendor should write the project charter as they are responsible for manufacturing the bears.

685


What are the categories in which the design patterns can be divided?

613


Is Visio a UML tool?

587


All of the following are true regarding configuration management except: A. Requires all acceptance decisions to be made through the CCB B. Serves as a change control system C. Describes the physical characteristics of the product of the project D. Controls changes to the characteristics of an item or system

658


What's the benefit of using inheritance?

669


Define Initialisation Purpose.

568