AZTEC placement papers ------- placement paper 1

1 7080

Post New AZTEC Placement Papers Interview Questions



Un-Answered Questions

i want to increase my ups back time ,i have added one 12v 68ah battery to my ups but it is not working ,is it possible to make adjustment so that new battery will work.

1682


4. What is the command from BSC to check the alarm in BTS

798


Difference between main program and a sub program in PL/1?

752


In Stability testing if significant change occurs then what will be the action plan?

2066


What will be the planned expenditure in the budget 2009-10

1131






What will be the cause of high temperature in one cylinder of D/E?

579


Hi is there is any tool to debug Delphi ISAPI dlls in borland 2006 framework. AS i am a new to delphi borland i need a detailed description for debugging the web application in delphi as per my analysis the ISAPI dlls calling the htm files please help me ....

1249


Is it possible to split the print reviewer into more than one region ?

1012


How we will get issues on AS/400 technology ? I mean which issue/Defect Tracking tool is using in all companies when any issue comes? Can anybody explain about the work flow of AS/400 project ? plzzz

110


Why should we hire you over the others waiting to be interviewed?

927


i am going to give the JSEB,RANCHI exam for power plant,so i need some samples of papers related to that,so please send me these papers by my mail id.

2194


What is WP19 Cancel Activity & WP20 Cancel Case?

657


what is the hanekom repairing material after concreting work

1015


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1044


explain about completely flow of sequencers technicaly,without using example??explain about lookup,nullhandling?

1112






AZTEC Placement Papers Interview Questions
  • OOPS (1)
  • MFC (1)
  • PHP (1)
  • Visual Basic (1)
  • C Sharp (1)
  • Dot Net General (1)
  • Oracle General (2)
  • Databases AllOther (2)
  • Windows AllOther (1)
  • WinRunner (3)
  • Load Runner (6)
  • QTP (15)
  • Manual Testing (54)
  • QA Concepts (8)
  • Mobile Testing (2)
  • Test Cases (1)
  • Servlets (5)
  • J2EE (1)
  • SAP ABAP (1)
  • Chemical Engineering (1)
  • Placement Papers (1)
  • L1 Visa (1)