What are different types of locators?
What is the strong name in .net assembly?
How do I merge two word documents with different formats?
What is innerhtml in jquery?
What is off cycle payroll run
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How did c++ start?
What is the main control parameter for settlement?
What is the Difference between a process and a thread?
Describe Memtable?
Is ajax built into javascript?
What are the uses of ms powerpoint?
Which command is used to view the content of the table in mysql?
Write a program to swap two numbers without using a temporary variable?
What are service containers?