Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • ASD Lab aptitute test questions (3)
  • ASD Lab interview questions (55)
  • ASD Lab technical test questions (5)



ASD Lab Interview Questions
Questions Answers Views Company eMail

Under Data Transfer Portion of ABAP, what do you mean by DX Project

1140

display selected value in dropdown list through javascript without page refresh

5 84106

Since we can create managed bean by two ways as, we can define the bean name in faces-config.xml file so that page can use that OR we can write annotation on bean class so that it is automatically assign to page but I want to know which one is good programming practice ? And also mention disadvantage of other which should not prefer ... Thanking you...

1189

Can a 9" x 24" RCC beam be supported on 18" x 18" RCC beam.

1 3557

WHAT IS THE LOWER LIMIT & UPPER LIMIT WHEN DIMENSION IS 9.0- 0.042-0.027

3 2043

Post New ASD Lab Interview Questions



Un-Answered Questions

What is Home Loan Modification?

854


Give an account of antibodies against pET30c fusion protein ?

953


Explain about semisynthetic penicillins and indicate their uses in therapy.

928


What makes you stay here for longer years?

554


i had a source containing business,sales,details column and i have to load it to a target but i have some bad records in it , but i have to load 70% of business records and 50% of sales and 95% of details records excluding bad records to achieve this what should be done and what all logic and tx should be used can anyone help? thanks in advance

823






Can you tell me how to add new column in existing views?how?How is possible?

148


How is it possible to do a cross-sysplex copy of a PDS dataset by running one JCL on the target sysplex? I tried to use IEBCOPY with SUBSYS & CSM as follows: //CSMTRAN1 EXEC PGM=IEBCOPY //SYSPRINT DD SYSOUT=* //SYSUT1 DD DSN=PDS-Dataset-name-from,DISP=SHR, // SUBSYS=(CSM,'SYSPLEXNAME-FROM') //SYSUT2 DD DSN=PDS-Dataset-name-to,DISP=OLD, // SUBSYS=(CSM,SYSPLEXNAME-TO') //SYSIN DD DUMMY This did not work. I always get the following error "IEB1071E DD NAME SYSUT1 IS SUPPOSED TO BE A PARTITIONED DATA SET BUT IT HAS NO DIRECTORY. EXPECT A TERMINAL I/O ERROR. (DS1LSTAR=X'000000' DS1DSORG=X'0000' JFCDSORG=X'0200') " The source dataset is a catalogued pds dataset with many entries. The target dataset is allocated in the same job some lines before the transfer. I got an example like this for PS datasets with IEBGENER. But for PO datasets there should be a similar possibility...

2064


Suppose the price elasticity of demand for the textbooks is two and the price of the textbook is increased by 10% By how much does the quantity demand fall? Enter the results and discuss reason for the fall in quantity demand.

1102


what is the procedure and explain about real time scenario.

651


IN THE REPORT I WANNA APPLY HYPERLINK FOR A CELL IN THE COLUMN/ROW HOW TO ACHIEVE THIS? EG: YEAR COLUMN : 2001,2002,2003,2004 I WANNA APPLY FOR 2001 ONLY

7633


what is INFORMATICA TESTING process

967


Expand-------IETF

944


what is inheritancy where u required ?

742


Is there any standard procedure to test the application as a whole? Or How can I test complete application right from the requirement gathering?

779


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

951






ASD Lab Interview Questions
  • OOPS (1)
  • PHP (4)
  • SQL Server (2)
  • Windows Threads (1)
  • Windows General (1)
  • WinRunner (1)
  • Manual Testing (3)
  • Core Java (1)
  • J2EE (1)
  • Business Objects (1)
  • Data Stage (1)
  • SAS (1)
  • Data Warehouse General (2)
  • Design Patterns (1)
  • SAP ABAP (1)
  • SAP PP (1)
  • SAP FI CO (1)
  • SAP Netweaver (1)
  • Oracle Apps Financial (1)
  • Encryption Decryption (1)
  • General Physics (1)
  • Civil Engineering (1)
  • Mechanical Engineering (2)
  • Electrical Engineering (3)
  • Engineering AllOther (1)
  • Marketing Sales (2)
  • Banking Finance (1)
  • Business Management AllOther (1)
  • Accounting General (3)
  • Accounting AllOther (1)
  • Advertising Media AllOther (1)
  • Call Centre AllOther (2)
  • APPSC AllOther (2)
  • General Knowledge_Current Affairs (2)
  • Government AllOther (1)
  • General Aptitude (2)
  • Puzzles (1)
  • CCNA (5)
  • Microsoft Certifications (1)
  • C++ Code (1)
  • J2ME Code (1)
  • Python Code (1)