Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • ASD Lab aptitute test questions (3)
  • ASD Lab interview questions (55)
  • ASD Lab technical test questions (5)



ASD Lab Mechanical Engineering Interview Questions
Questions Answers Views Company eMail

I want a RRB model question for Diploma mechanical Engg.

6 12878

WHAT IS THE LOWER LIMIT & UPPER LIMIT WHEN DIMENSION IS 9.0- 0.042-0.027

3 1973

Post New ASD Lab Mechanical Engineering Interview Questions



Un-Answered Questions

what is PROMOTIONS in FMCG?How the sales executive r sales officer will participate r conduct these promotions?

2349


what is turn over? what is vat? what should ido to become a expert in acount? plese ans me

739


what is the working principle of energy saver control panel. please give the complete calculation & theory.

923


Would you please provide me with questions collected for interview regard to pressure vessel, which is in the aspects of welding, NDT, materials and painting? Please send these questions&answers to lgx_jasmine@126.com within 1 week, Thank you for your help. Rgs!

612


What is build interval period?

935






How many separate files do you have under QVCS control for managing the QVCS product itself?

972


How to do Petrifilm?

856


Explain the process control block of UNIX ?

391


why your are looking for a change presently

2470


What happens to a NameNode that has no data?

338


what is Forward,Reverse and Re_engineering?

900


who is best faculty for sharePoint and Biztalk sandeepsoni from Deccansoft or premnath...........

1253


Name Of Parts And Each Purpose

693


Explain LTP.

194


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1067






ASD Lab Mechanical Engineering Interview Questions
  • OOPS (1)
  • PHP (4)
  • SQL Server (2)
  • Windows Threads (1)
  • Windows General (1)
  • WinRunner (1)
  • Manual Testing (3)
  • Core Java (1)
  • J2EE (1)
  • Business Objects (1)
  • Data Stage (1)
  • SAS (1)
  • Data Warehouse General (2)
  • Design Patterns (1)
  • SAP ABAP (1)
  • SAP PP (1)
  • SAP FI CO (1)
  • SAP Netweaver (1)
  • Oracle Apps Financial (1)
  • Encryption Decryption (1)
  • General Physics (1)
  • Civil Engineering (1)
  • Mechanical Engineering (2)
  • Electrical Engineering (3)
  • Engineering AllOther (1)
  • Marketing Sales (2)
  • Banking Finance (1)
  • Business Management AllOther (1)
  • Accounting General (3)
  • Accounting AllOther (1)
  • Advertising Media AllOther (1)
  • Call Centre AllOther (2)
  • APPSC AllOther (2)
  • General Knowledge_Current Affairs (2)
  • Government AllOther (1)
  • General Aptitude (2)
  • Puzzles (1)
  • CCNA (5)
  • Microsoft Certifications (1)
  • C++ Code (1)
  • J2ME Code (1)
  • Python Code (1)