I have done B.Sc.(H)Zoology.Presently doing MBA(Global Business).Went for an interview.There they asked me "Why did you do MBA after doing B.Sc.?"
20 62247When i go to interview in any company they told me only one question why u r join this company and why u r quit for your current job ?
8 22264Railway Recruitment Board (Bhubaneswar) Station Masters Recruitment Exam August 2004 Question Paper
4 19839If a clock based on oscillating pendulum is taken from the earth to the moon, then it will 1 Become slow 2 Become fast 3 Give same times as that on the earth 4 Stop working
3 14084Post New Idbi Bank Interview Questions
Have you ever made mis reports and what are they?
Please send ford technologies placement paper 2 my mail id
Is there a way to remove the last object from a list?
What version of sap do I need to be on?
What is latest javascript version?
can anybody send me the technical papers of hewitt associates pls...I cleared aps n GD n has only less time for technical round?
What if I write static public void instead of public static void?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
send previousyear question paper for ongc gt 2011 chemical engineering written exam
Plz if anybody has placement paper of HAL mail me i m Chemical engg my id er.kotnala@gmail.com
What is FTSE at today?
Any body have QTP 9.5 licence key. please provide me at madhukar_dec30@yahoo.co.in
How would you describe your own personality
You have a stored procedure, which execute a lengthy batch job. This stored procedure is called from a trigger you do not want to slow the data entry process you do not want trigger to wait for this batch job to finish before it completes itself what you can do to speed up the process?
What is the current version of ruby on rails?