Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1. Five steps of implementation with full details.

Answer Posted / devarshi shukla

ASAP stands for Accelerated SAP.

Its purpose is to help design SAP implementation in the most efficient manner possible. Its goal is to effectively optimize time, people, quality and other resources, using a proven methodology to implementation.

The Five Phases of Implementation as under:

Phase 1 Project Preparation
Phase 2 Business Blueprint
Phase 3 Realization
Phase 4 Final Preparation
Phase 5 Go-Live and support

Phase-1 initiates with a retrieval of information and resources. It is an important time to assemble the necessary components for the implementation. Some important milestones that need to be accomplished for phase 1 include

- Obtaining senior-level management/stakeholder support
- Identifying clear project objectives
- Architect an efficient decision-making process
- Creating an environment suitable for change and re-engineering
- Building a qualified and capable project team.


Phase 2- Business Blueprint

SAP has defined a business blueprint phase to help extract pertinent information about your company that is necessary for implementation. These blueprints are in the form of questionnaires that are designed to probe for information that uncovers how your company does business. As such, they also serve to document the implementation.

Each business blueprint document essentially outlines your future business processes and business requirements. The kinds of questions asked are germane to the particular business function, as seen in the following sample questions:

1) What information do you capture on a purchase order?
2) What information is required to complete a purchase order?


Phase- 3 - Realization

With the completion of the business in phase 2, "functional" experts are now ready to begin configuring SAP.

The Realization phase is broken in to two parts.

1) Your SAP consulting team helps you configure your baseline system, called the baseline configuration.
2) Your implementation project team fine-tunes that system to meet all your business and process requirements as part of the fine tuning configuration.

The initial configuration completed during the base line configuration is based on the information that you provided in your blueprint document. The remaining approximately 20% of your configuration that was not tackled during the baseline configuration is completed during the fine tuning configuration.
Fine tuning usually deals with the exceptions that are not covered in baseline configuration. This final bit of tweaking represents the work necessary to fit your special needs.

Configuration Testing-
With the help of your SAP consulting team, you segregate your business processes into cycles of related business flows. The cycles serve as independent units that enable you to test specific parts of the business process. You can also work through configuring the SAP implementation guide (IMG). A tool used to assist you in configuring your SAP system in a step by step manner.

Knowledge Transfer-
As the configuration phase comes to a close, it becomes necessary for the Project team to be self-sufficient in their knowledge of the configuration of your SAP system.Knowledge transfer to the configuration team tasked with system maintenance (that is, maintenance of the business processes after Go-live) needs to be completed at this time. In addition, the end users tasked with actually using the system for day-to-day business purposes must be trained.

Phase 4 - Final Preparation
As phase 3 merges into phase 4, you should find yourselves not only in the midst of SAP training, but also in the midst of rigorous functional and stress testing.Phase 4 also concentrates on the fine tuning of your configuration before Go-live and more importantly, the migration of data from your old system or systems to SAP.
Workload testing (including peak volume, daily load, and other forms of stress testing), and integration or functional testing are conducted to ensure the accuracy of your data and the stability of your SAP system. Because you should have begun testing back in phase 2, you do not have too far to go until Go-live.
Now is an important time to perform preventative maintenance checks to ensure optimal performance at your SAP system. At the conclusion of phase 4, take time to plan and document a Go-live strategy. Preparation for Go-live means preparing for your end-users questions as they start actively working on the new SAP system.


Phase 5 - Go-live and Support

The Go-live milestone is itself is easy to achieve; a smooth and uneventful Go-live is another matter altogether. Preparation is the key, including attention to what-if scenarios related not only to the individual business processes deployed but also to the functioning of technology underpinning these business processes and preparation for ongoing support, including maintenance contracts and documented processes and procedures are essential.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

when ever we are creating a rental contracts, if we go for the item level data in va44, revenue is not recognizing, which leads the plant and division is not copied in the item level data, please send if any one knows the answer ASAP.

2666


Can we configure third party skus to consignment process.

1574


What copy control is and when copy control transition can be done? In what manner copy control transition can be done?

1342


What are the various sections of the 'customer master record'?

1069


What is a standard transport layer in sap ? : transportation management

1352


A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system

1920


During route determination the system also needs to know the departure zone of the goods to be shipped. How does this information come into the sales order?

1193


What is the relationship between sales organizations and company codes?

1205


What are the main and sub modules in sap?

1162


Hi friends. I am srinivas. I want to know the text determinatin. What is the text determination. What is that use. Where can we use text determination in real time. Pls explain me in detial with example.

2483


Can the items in a billing document belong to different distribution channels?

1139


Where do you assign text determination procedures for customer master records and for documents?

1236


I was faced these interview questions, please provide answer with your real life experience SAP gurus. 1. As a SAP SD consultant how did you integrate/interact with MM and FI/CO? 2. Tell me about your OTC process expreience? 3. How have you used MASS tool in your last project, and to upgrade what data? 4. Tell me about your EDI/IDOC experience? PLease answer any/all questions as per your wish. Thank you very much in advance, god bless.

2024


What is alternative condition base value? Give an example?

1127


What is product attributes in sap sd?

1140