Integration of PP with MM , Integration of PP with SD .

Answer Posted / c.kartikeshwar

SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

list the important tables used in pp.

553


Different types of consumption based planning.

2096


What are the types of master views for production and planning?

667


Explain Kanban.

1098


What does a PP Consultant do in his/her real time?

2337






Explain what is the use of sap material view and list out other parameters where sap material view is applicable?

594


What is meant by slab?

585


How to create opbject dependencies in a bom for a configurable material?

705


What are the steps of production execution process?

627


Explain how to create prt master records?

663


Which BOM item category you have used?

972


How can you get planned orders scheduled so that you can do capacity leveling ?

627


What is planning file entry

1862


What do we do in the realization phase?

531


What is Auto GR?

1192