Answer / chaithanya
Integration of PP with MM is at the MRP stage, ie when the
material in stock is not at the required quantity, the
material request is sent to MM people.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
Is This Answer Correct ? | 0 Yes | 0 No |
What are the types of master views for production and planning?
What are all the steps involved in Variant Configuration?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
Can't one material be assigned to more than one operation in a routing?
Difference between different strategy groups.
How to create plant?
2 Answers GPIL, Yash Technologies,
specify three views for which formulas can be entered.(work center)
How did you configure the payscale structure?
How does sap know that an operation has components as indicated by the component allocation indicator?
What is MTS and MTO and the difference between them?
What is the SPRO Path for requirement class and req. type?
Define lsmw.