What is the diffrence between Beta Testting & Acceptance
Testing

Answer Posted / mudaseer

for example my project is on android in android we test the build and check whether all the scenarios are working or not
if it is working fine we submit the build to client and client does testing to check whether it is acceptable or not.if there are any bugs he will tell the developer to fix it and again the test engineer tests and send to client he will check and if he is satisfied he uploads the build to android market(google play) now the end users download the build and
use the application and any bug's are there the end users report it this is known as beta testing

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Diffrernce between client server testing and web server testing.

1740


What is a test server?

727


What is quality center?

675


Why would we not include these?

706


What is an end-to-end testing?

627






what are risks and contigencies(solutions) of an ecommerce (online shopping and bidding project)application?we describe this in Test plan can anyone tell me abt this?

1576


qtp9.2 and qtp10.0 difference

3037


is it possible web application make it as executable file

1893


In our project, we use Withdrawal Indent, we are confused to use heading as "Withdrawal Indent" or "Withdraw Indent". Please suggest me which one to use ASAP, Thanks in advance

1542


Different types of design diagrams that supports to write test cases ?

1873


Define brain stromming?

643


What is Traditional testing & Object Oriented testing?

1966


Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2

3041


1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?

1865


how will you test transfer funds module...explain in detail

1167