Answer Posted / shahid hussain
Beside all above answers I would add following:
It helps Standard Cost Estimate to be maintained on a
selected BOM and Routing (Production Version), can be fixed
in Material Master Costing 1 Tab
It Helps Planning for MRP to maintain the quota arrangement
for procurement proposals which is important for supply
chain planning and execution
Also help to avoid change/delete your master data (BOM
Routing etc) by controlling it through production versions
validity depending on
Lot Size
Validity Date
Help to have production planning by means of using line loading
Also help for mix costing ratios on mix costing scenario
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In sap-pp what are the costing parameters?
Tell some standard order types and what configure done for current project
Define ‘bom group’?
How does sap know that an operation has components as indicated by the component allocation indicator?
After doing realization how we will check whether it is working or not?
What is time phased Planning?
what do you mean by opening periods
Mention what are the types of master views for production and planning?
Standard mrp steps
Explain Availability check.
What is a ‘bom’?
What is it 41 used for?
Difference between plan cost, Actual cost and target cost.
How is time management and payroll is integrated?
What is the data you give in SOP