Answer Posted / gobinath r
Production Version:
Alternative Routing with alternative BOM selected upon the
lotsize for better production efficency.for example the
company may have different production methods for different
lot size produced.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
SPRO path for order, confirmation or requirement class.
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is mrp group and what is the use of it?
What is plm (product lifecycle management) in sap pp?
What is the use of infogroups?
Difference between different strategy groups.
Which tool you are using
what are the settings needed for variant configuration?
What are the customer activities followed for pp module ?
What is alternative BOM, or diff between BOM group and Group BOM?
What are the key fields in MRP views?
How is indian slab and us slab?
Standard mrp steps
What is MTS and MTO and the difference between them?
What is a ‘routing’ in pp?