1.if v wanna hire person,instead f hiring action will the
system allow us 2 do promotion 4 hiring?how the system knows?
2.in 1IT,cost center field will b there.if a position is
assigned to X cost center, organizational unit is assigned
to A cost center, then which 1get displayed in 1IT?
3.if v wanna do retro active a/c for a particular
employee,other than control record where v can do that n How
the system knows retro active a/c?
4.Difference between processing, cumulation and evaluation
classes?
5.how Integration switch PLOGI works?
6.what Features do in SAP?how they works?
7.Process model?

Answer Posted / chennakesavareddy

1) The system will never allow us, instead f hiring action
will the system allow us 2 do promotion 4 hiring.

2) The system will display cost center which is assigne dto
position.

3) We can do retro accounting based on IT0003 other than
control record.

4)The difference between processing, cumulation and
evaluation classes...
Processing class: It determines, how the wage tpes are
process during payroll run.
Cumulation clas: It cumulates, the wage types during
payorll run to get total amount.
Evaluation class: It mainly concentrates on, which wage
types/components have to be shown in payslip, i.e whether
it is in summery part/deduction part/ gross part.

5) There are many features in SAP HR, for example.. ABKRS,
PINCH, VDSK1, SCHKZ, TMSTA, WWEEK, WRKHR, TARIF, LGMST,
ANSAL, ZLSCH, CONTR, DATAR, NUMKR... etc.. these all are
used to default a perticular fields in relevant info types.
6) Process models are used to link up together many
programs. which are needed to do a complete run in payroll.

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is off-cycle payroll?

575


How do you end and start a new session in sap?

574


List the most important structures in hr.

529


While processing the salary for the m/o May 2012,the following error is being shown: 1.The salaries have been revised w.e.f 01.04.2012 in the m/o May 2012.Hence the May salary will include the arrear of April 2012. 2.Though the processing is successful, the periods reflected as 917 is wrong .Ideally it should be 246(123*2). 3.T-Code is PC00_M40_CALC Please examine the problem asap and revert https://mail.google.com/mail/u/0/?ui=2&ik=5c73645d0a&view=att&th=13787f525b8779c7&attid=0.1&disp=emb&realattid=9a07681551f0b854_0.1&zw&atsh=1

1448


Can a qualification group be attached to a person instead of attaching 100 qualifications individually to the person?

547






What is the transaction code to maintain the authorization main switch?

596


What is the use of employee subgroups?

569


What is the characteristic of a half-day holiday class?

512


Explain the t code for payroll result.

543


Explain the characteristics of wage type?

517


What is Employee Subgroup Grouping For Daily Work Schedules?

623


What is authorization In Sap?

599


What is the basis for creating an organizational plan?

553


What is the controlling area, what does it do, and how were is it assigned?

518


What is applicant Structure?

599