What r different reduction startergies in SAP PP?

Answer Posted / srinu

Reduction strategy means reduce the time intervels in the
Production.for example, overlapping and skipping.

Is This Answer Correct ?    9 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?

686


Difference between base unit of measure, production unit, order unit

2624


You want to integrate pp with fico. What steps would you take?

586


Explain about rough cut planning

1365


What is the Difference between TECO and CLSD?

4733






How can you create production order without routing and BoM?

1026


In project the customization is comes under which phase?

582


Explain what is prt (production resource tools) in sap pp?

597


What are gaps? Some examples?

589


We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?

651


what are the constraints of Variant configuration?

1688


What is the data you give in SOP

3302


What is collective order. Pre requisite of the collective order?

2056


You want to insert an inspection check point at the end of an operation. How would you do that?

626


what does SAP business workflow do?

1624