if a very low defect (user interface )is detected by u and
the developer not compramising with that defect what will u
do?
Answer Posted / ram kumar
i will send to the defect through bug report tool with
screen shots fixed it as a low priority and high severity.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to write manual testcases for download the files from the template. for example:from product cost enddate
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
What are differences in testing a client server and a web application?
What is the difference between baseline and traceability matrix?
negative test cases on banking domain ?
1) Test summary contains ? 2) Requirement Tracebility means ? 3) Test Effort contains ? 4) Test Planning Productivity ? 5) Metrics should be caluclated ? 6) Interest rate Rsik is a type ? 7) Test analysis and Design process task? 8) secured loan is a part of Liability (or) assest in a balance sheet? 9) Money Market means? 10) a ------ specifies all of the terms of a loan and the obligations borrower ? 11) what is a primary market is ? 12) Quality of Testing measure with ? 13) Company has a share with facevalue 10 rs/- and NAV of 37 after comapny has given Dividend of 35 % then How much NAV become ? ( I don't know what is NAV means, question overall Idea I am giving not 100% perfect ) the potions for these are 1) 33 2) 33.50 3) 37 4) 42 14) one compay has taken 10 million loan from a bank for a Interest rate is 10 % and base amount is 0.4% so how much they had paid monthly Emi ? they provideansews like 1) 100000 2) 114000 3) 140000 4) 104000 Remaing questions I not remember.
What does entry and exit criteria mean in a project?
Could someone please send me real check list for Database Security testing.Please my mail ID- patil.ramchandra@yahoo.co.in. Thanks.
10 scenarios for security testing using gmail applications?
How to test a Falsh player scrollings?
can anyone tell me few critical bugs in ecommerce project.
If you are handling a product testing and if there are around 100 test cases and in them few test cases are failed then at the end of the day how will you treat whether the product is pass/fail.? consider the failed test cases are in functional requirements.
what do you mean by Develop test data through sourcing (or) handcrafting techniques
What are the typical risks that you identify during test planning and their mitigation plan and Contengency plan.
Give an example for pre testing and post testing ?