What r different reduction startergies in SAP PP?

Answer Posted / prabhu

Reduction Strategy:To reduce the lead time for scheduling
by Reducing the Que time,Reducing the Transport time,By
overlapping and introducing the Number of splits.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is time phased Planning?

1304


Difference between MD01, MD02 and MD03.

11685


Define mrp list

677


how many times pcc can run for one material?

2166


How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks

2513






What is meant by slab?

592


How to create object dependencies in a bom for a configurable material?

609


Explain DMR.

1706


what are the problems you faced in MRP?

1421


What is activity type and how it works in costing?

1102


What does the use of ms70 followed by mcec get you?

635


How can I use variable size items?

655


What is the difference between pp and pp-pi? Which one is better and how ?

827


Explain what is prt (production resource tools) in sap pp?

598


How the processing time is calculated in a wc when both labor, machine categories exist?

593