If process order is technically closed, by mistake
I want to process that order again can I do it?

Answer Posted / bharathish

First you have to do revoke Teco and then process the
order,other wise system wont allow..

Is This Answer Correct ?    18 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do we do in the realization phase?

540


What is Phantom Assembly?

1085


What is the Difference between TECO and CLSD?

4757


How do you get the system to update this value from the routing?

590


How system calculate the actual cost?

1290






what is group bom? Is it possible to attach the drawing for a material to bom? How?

704


Explain what is the meaning of exploding a bom?

631


How to insert an inspection checkpoint at the end of an operation?

736


We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?

686


Why and how you calculate WIP?

1213


What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?

1718


What is Backflush, the places where the backflush is used?

1663


Define standard cost

715


What is the planning horizon?

660


Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.

1577