If process order is technically closed, by mistake
I want to process that order again can I do it?
Answer Posted / bharathish
First you have to do revoke Teco and then process the
order,other wise system wont allow..
Is This Answer Correct ? | 18 Yes | 0 No |
Post New Answer View All Answers
What do we do in the realization phase?
What is Phantom Assembly?
What is the Difference between TECO and CLSD?
How do you get the system to update this value from the routing?
How system calculate the actual cost?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Explain what is the meaning of exploding a bom?
How to insert an inspection checkpoint at the end of an operation?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Why and how you calculate WIP?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is Backflush, the places where the backflush is used?
Define standard cost
What is the planning horizon?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.