Can a variable length segment be declared in IMS? If yes,
what is the structure; If no, why?

Answer Posted / gopal

seglen= maximum length of the variable segment you need to
mention in the dbd segment defination along with seg name .

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the maximum of key fields and search fields allowed in a segment?

2807


What is the disadvantage of dynamic generation of acb?

584


What is dbms in ims?

608


Explain the maximum number of levels allowed in ims db?

3349


What is acbgen process?

699






Explain psbgen process?

719


how to create a changeman read only audit and update only audit Specifications for the Read only Audit 1) Read HFFD database unqualified. 2) Read FDRT, FDDM, FDAP segments. If FDAP-APP-STS is ‘2’ read the FDAV segment and get the FDAV segment which has FDAV-APV-OPTION as ‘X’ If FDAP-APP-STS is ‘5’ read the HFAC database. Read the ACRT segment qualified based on the key obtained from the FDAP segment from HFFD database. Conditions for writing into output file: a. App Type should be NEWR b. App Status should be 1, 2 & 5. c. Write 50 records per app status. For e.g. first 50 records for App status 1, 2 & 5 each The output file should contain the following fields from the database FDRT-COMP-CTRY-CODE X(03). FDRT-CUST-ID-NUM X(10) FDDM-DEM-SEQ-NUM X(01) FDAP-APP-SEQ X(02) FDAP-JNT-IND X(01) FDAP-APP-STS X(01) FDAV-APV-OPTION X(01) FDAV-APV-DT X(06) FDAV-APV-AMT X(07) ACRT-ACCT-NUM X(06) ACRT-SEG-BUS-TYPE X(02) ACRT-NM1-LAST X(19) ACRT-NM1-SS X(09) ACRT-NM1-1ST X(12) ACRT-NM1-INIT X(01) ACRT-NM1-SFX X(03) ACRT-NM1-TITLE X(02) PSB – DVAN2BMP In case you get a GE for any of the conditions, write to output file along with the details of the database segment which was not found. We need to complete this whole process by tomorrow. Run the audit in DLI mode. 2) Sort the output file created in step 1 on Cust ID, Dem Seq & App Seq. Specifications for the Update Audit 3) Take the output of step 2 as input for an update audit. Details are as follows: Read each record & check the app status. If app status is less than 2 then update the FDAP-NEW- MONEY-ENT to $25000.00 PSB - AUDBMPJ The job would be a BMP job. The test job would be run in IMSE region. Note - The proc (which will be called by the job) and the job should also be present in the change-man package itself. You’ll have a test job in your PDS along with overrides to execute the program in test regions. The job would be a DLI job. The test job would be run in IMSE region. It’ll have the following steps. 1) Delete-define output and error files. 2) Use a copybook for the output layout.

3212


What is dbd?

595


What is the need of a secondary index in IMS?

668


What are the two ways in which dl/i interface can be invoked?

536


Explain the maximum number of segment types allowed for a single database?

1803


Explain the disadvantage of dynamic generation of acb?

552


Define dl/i?

3132


What is meant by batch dl/i mode?

587


What are the retrieval sequences in ims db?

766