How can we increase the size of an existing PDS to include
more no. of modules.
I tried the answer posted by Jagan(TSO PDS 'pds name') but
did not find it working.
The answer posted by kamal i know very well.
Please suggest me a answer so that we don't need to delete
the existing PDS and still we can change the size as well.
Answer Posted / phani
The exact answer for the ans#3 is
Go to start--> 3-->1-->C.(No need to go to 3.4)
Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
how do you define single dimensional array and multidimensional array in your cobol?
What is the problem of ordered sequential files access?
What is the difference between perform … with test after and perform … with test before?
Which mode is used to operate the sequential file?
How you can read the file from bottom?
How to use the same COBOL program in Batch and CICS on lines? explain with an example
How arrays can be defined in COBOL?
What is the difference between comp and comp-3 usage?
How many bytes S(8) comp field occupy and its maximum value?
What is comp-1 and comp-2?
Describe the cobol database components?
What are different data types in cobol?
What is the difference between a binary search and a sequential search what are the pertinent cobol?
What is inspect in cobol ?
Can we change the password using ALTER? anyone tried and changed?