Answer Posted / sundhu
Use of Pegged Requiremets:
You can use the Pegged requirements function to retrace
from any BOM level
1) which requirements are the source of which procurement
proposals
2) which independent requirements (especially sales orders)
are affected if a procurement proposal is cancelled or a
date or quantity is changed on a lower level.
Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
What is the use of mrp pp evaluations?
What is detail scheduling
Mention how mrp (material requirement planning) types are classified?
What are all the ‘technical types of bom’?
What are the t-codes for creating, changing and summarizing bom?
What does the use of ms70 followed by mcec get you?
What is the difference between indian and us payroll?
What happens to plan after it has been converted into production order?
How do you restrict the data to be entered in the payroll area?
Explain what is the need of mrp list if the stock requirement list is already given?
What is the standard info set?
What are the reports generated in product cost controlling information system?
What is scheduling
Difference between different strategy groups.
Explain service level agreements