Answer Posted / david
I might add that batch processing thru a secondary index is
extremely slow with many IOs. It is best used in an online
transaction when just one record is being processed at a time.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are the two types of fields available in ims db?
What is the need for a secondary index in ims?
What are the disadvantages of a hierarchical database?
Explain the maximum of key fields and search fields allowed in a segment?
What is ims (db/dc)?
What is the maximum of key fields and search fields allowed in a segment?
What is the maximum number of fields allowed per segment and what is the maximum number of fields per database?
Define pcb?
Explain the maximum number of pcbs allowed in a psb?
how to create a changeman read only audit and update only audit Specifications for the Read only Audit 1) Read HFFD database unqualified. 2) Read FDRT, FDDM, FDAP segments. If FDAP-APP-STS is ‘2’ read the FDAV segment and get the FDAV segment which has FDAV-APV-OPTION as ‘X’ If FDAP-APP-STS is ‘5’ read the HFAC database. Read the ACRT segment qualified based on the key obtained from the FDAP segment from HFFD database. Conditions for writing into output file: a. App Type should be NEWR b. App Status should be 1, 2 & 5. c. Write 50 records per app status. For e.g. first 50 records for App status 1, 2 & 5 each The output file should contain the following fields from the database FDRT-COMP-CTRY-CODE X(03). FDRT-CUST-ID-NUM X(10) FDDM-DEM-SEQ-NUM X(01) FDAP-APP-SEQ X(02) FDAP-JNT-IND X(01) FDAP-APP-STS X(01) FDAV-APV-OPTION X(01) FDAV-APV-DT X(06) FDAV-APV-AMT X(07) ACRT-ACCT-NUM X(06) ACRT-SEG-BUS-TYPE X(02) ACRT-NM1-LAST X(19) ACRT-NM1-SS X(09) ACRT-NM1-1ST X(12) ACRT-NM1-INIT X(01) ACRT-NM1-SFX X(03) ACRT-NM1-TITLE X(02) PSB – DVAN2BMP In case you get a GE for any of the conditions, write to output file along with the details of the database segment which was not found. We need to complete this whole process by tomorrow. Run the audit in DLI mode. 2) Sort the output file created in step 1 on Cust ID, Dem Seq & App Seq. Specifications for the Update Audit 3) Take the output of step 2 as input for an update audit. Details are as follows: Read each record & check the app status. If app status is less than 2 then update the FDAP-NEW- MONEY-ENT to $25000.00 PSB - AUDBMPJ The job would be a BMP job. The test job would be run in IMSE region. Note - The proc (which will be called by the job) and the job should also be present in the change-man package itself. You’ll have a test job in your PDS along with overrides to execute the program in test regions. The job would be a DLI job. The test job would be run in IMSE region. It’ll have the following steps. 1) Delete-define output and error files. 2) Use a copybook for the output layout.
Explain acbgen process?
What is the disadvantage of dynamic generation of acb?
Can we use procopt on pcb and segment field (senseg)?
Explain the disadvantage of dynamic generation of acb?
Which languages does ims support / application program languages?