How is BP in CRM synchronised with R/3? What r all the
steps involved?can we do the partner determination based on
SALES AREAS?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Architecture Design AllOther Interview Questions

what is the standard bricks size, and which tools required for mason work

1 Answers  


Explain about the natural building techniques, especially Cast Earth.

1 Answers  


what is the difference between load bearing structure and framme structure?

1 Answers  


Which of the following sentence is not correct

2 Answers   NATA,


What is the name of the first type of building used in Christian Churches?

0 Answers   RRB,






What are the properties of anthill/termites soil and its use in construction?

4 Answers  


What does the term "green architecture" mean?

2 Answers  


I want to build a home by digging a large hole and cementing the floor and all walls, then making a slanted roof for water runoff, with windows on the south side. How will I keep a steady temperature of 68 degrees with no moisture?

1 Answers  


IF there is any software available in market which can give heat load calculations of any area,the air conditioning tonnage,the exhaust & fresh air requirement of any area. If the software is available then from whwre.

0 Answers  


1)At present you r using cement but olden days what they r using?

5 Answers   CCCL,


why you want to become artictecture

0 Answers   JP Group,


What is the more accurate formula to convert wet concrete to dry aggregate instead of the 54% method?

0 Answers   Tech Mahindra,


Categories
  • Interior Design Interview Questions Interior Design (21)
  • Architecture Design AllOther Interview Questions Architecture Design AllOther (185)