A bus started from bustand at 8.00a m and after 30 min staying at destination, it returned back to the bustand. the destination is 27 miles from the bustand. the speed of the bus 50 percent fast speed. at what time it retur4ns to the bustand
No Answer is Posted For this Question
Be the First to Post Answer
Can any one send me question paper of obc po exam held on 21v december 2008 on my email Pinkys.y18@gmail.com
There is six letter word VGANDA . How many ways you can arrange the letters in the word in such a way that both the A's are together.
if the area of sqare increases by 69% then side of the sqr incr by
Whether from one system to another we are able to share the Data? Whether Antivirus helps the system to keep it safe from Virus? Why you consider yourself suitable for this post? Why you want to join in this company? And what made you to apply for this job? State with Reason What you think is best for your department? A)Strict Discipline B)Family Atmosphere C)Work as Team in Department Are you to relocate yourself to any site or Office as required by Company?
can anyone tell me how to prepare techinal apptitude question papers of mainframe.like syntel,capejemini pz let me know
Work can be done by 8 men and 10 women in 25 days, the same work can be done by 10 children and 5 women . in how many days 2 children and 3 men can do the work?
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
A clock showing 6 o'clock takes 30 secs to strike 6 times.How long will it take to strike 12 at midnight?
Hi, I am going to write a Exam for Bank Of India clerical Cadre Exam. I am a Diplomo Graduate(ECE) Pls send me Aptitude questions for general aptitude,nemerical aptitude,clerical aptitude, english language. if u have any. My address is sasirekha6@yahoo.com please send me.
Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18 9 3 I could not solve this. plz give any solution for this question
There are 6 consecutive numbers P, Q, R, S, T, U, not necessarily in that order. Given that, Q is 2 less that P, P is 3 less that T and R is 2 less than S, arrange them in an ascending order.