Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is shear key and steel schedule?

2 22898

how to calculate amount of materials for concreting and plastering?

3 27690

What are the various load combination in Limit state method?

Developer Building Contracting, DMRC, Engineers India Limited,

2 12419

What is the name of this multiplication factors ?

Engineers India Limited, L&T,

2141

Why the name is "partial safety factor" why not "safety factor"?

Engineers India Limited,

2136

Suppose a column is of 1mx1m dimension adn load is of barely 1 ton(no moment), will u provide the total minimum steel reinforcement, if not what will u do..?

Engineers India Limited,

1 6630

Design a rectangular channel.

CSI, Engineers India Limited,

2919

What are the grade of steel used in the concrete design.?

Engineers India Limited,

8 22956

What are the grade of steel used in the steel design.?

Engineers India Limited, L&T,

15 34618

What is the benefit of making a cantiliver proped.?

CCCL, Engineers India Limited,

7 12830

to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash

Omaxe,

3 8123

what is the breaking strength of wall tiles

Omaxe,

2521

what mean By core Billing

2317

what is the best method for analysing frames of multistoreyed structures

2 7926

Scaffolding IS code NO.

2259


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2469


how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you

2603


What is a projection line?

1187


What is Heavy Concrete & Normal Concrete

2810


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2148


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

2078


What is thumb rule in quality and quantity estimation of a Residential building??

1675


how to remove the quantity of metal 1 and metal 2 in concrete

1986


What is the tensile strength of marble?

1166


 What is difference between limit state and working stress method? How it is applies in building structure.

2334


How foundation is designed, Column design and beam design

2339


natucher of concrete &type of concrete?

2431


How to make tiles floor step by step procedure?

1975


as per is code, what is the minimum content of opc and ppc cement for rcc structure

2281


what are the ffactors you considered choosing the course?

2187