Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
1532Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
1600how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
1489Post New Civil Engineering Questions
how to convert sand in Cft to Kgs
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
How much quantity of rod binding work by a rod binder per day
how much one carpenter can doing shuttering of slab in one day
Does brick grows bigger every year?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
calculate the quantity of water for 1:6 cement mortar
How to come 1.54 from dry to wet concrete?
what does the track parameter mean in staad.pro?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?