Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1532

Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

Lodha,

1600

why do we not deduct volume of steel to find actual volume of concrete in practical???

Lodha,

1309

for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band

Aecom,

1388

how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

CDSIPL Centrodorstroy India Pvt Ltd,

1588

how to do cementicious paint for rcc walls of cw pump house

APGenco,

1530

how to calculate quantity of bricks in circular manhole with examples.

HMEL,

4974

Moisture content calculation for diff mix ratio's ??

1187

what is the most suitable foundation when construct a bird watching tower in a marshy land

1408

What is GSB gradation

1876

how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

Magnum,

1489

How many Steel used in 1 cum tower foundation

STCS,

1445

How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''

1633

what are the duties of Site Engineer in work site?

Amarprakash Developers,

1150

How will you Engage Labours on Site?

Amarprakash Developers,

1400


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

how to convert sand in Cft to Kgs

1469


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

1525


What is rate for brick masonry work of 1.0 m3 in cm 1:6?

726


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1883


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1372






In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1802


How much quantity of rod binding work by a rod binder per day

842


how much one carpenter can doing shuttering of slab in one day

2870


Does brick grows bigger every year?

652


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

2527


calculate the quantity of water for 1:6 cement mortar

1634


How to come 1.54 from dry to wet concrete? 

1804


what does the track parameter mean in staad.pro?

5442


How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.

997


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1664