Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
1992Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
2055how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
1627I am called for interview from north east power plant .so, I need some interview question which may help me.
1793how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M 2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
1 2565Post New Civil Engineering Questions
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What are advancements in civil engineering?
What is the use of water table & Kreb stone for drain
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
how to identify the failure of building by expansive soils
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
In block work seawalls what is the purpose of slip joints?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
What is kn measurement?
What is Curtailing of R/F
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What is the diff between cad & cadd?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?