Civil Engineering Interview Questions
Questions Answers Views Company eMail

Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1478

Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1542

What is the standard volume of pharma in cub ft

Deepa Constructions,

1273

Whats the meanig of ,'K' VALUE in the case of soil.....

1393

how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?

1170

I am called for interview from north east power plant .so, I need some interview question which may help me.

Power Plant,

1241

whats is difference between anchorage length and development length

1357

rate analysis,what is PERT, TMT ,UPVC

BPTP,

1 2407

What is unit weight of 1st class bricks ?

1 5768

How to arrive dry volume of concrete (1.52 to 1.57) ?

1892

What is the bar bending schedule

TCIL,

1 1853

technical name of shuttering plywood

1 3347

how many bag of cement needed for concreting 14.93 m3 at the ratio of 1:4:6 and 1:5:6

1 1752

Sir I am from jntuk R13 regulation...... Is there any chance to leave credits

JNTUK,

1 2131

how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M 2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M

1 1778


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

what is the weight of 6000 psi concrete in lb/cft?

3092


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

1879


please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1330


What is critical path method (c.p.m)?

685


Explain what is the release of lien?

644






Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

1766


1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

2014


Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

1574


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

1857


What Reinforcements Are Used In The Process Of Prestressing?

824


what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??

2616


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10171


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1262


what is c4x light weight cement blocks

5137


why we create short columns under grade slab?

1829