how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
1534For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
UPSSSC Uttar Pradesh Subordinate Services Selection Commission,
1154Tell the least count of a prismatic compass , surveyor compass , Theodolite & how we can determine it ?
2 568710'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
1 1729Post New Civil Engineering Questions
How to find out slope footing concrete
how to calculate weight of 1.8 cum of aggregate
What is the use of extruded feature in solidsworks?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
Design a rectangular channel.
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
Where will be the maximum bending moment in a TEE Beam?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How to calculate paint drums per meter square
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?