VSS Interview Questions
Questions Answers Views Company eMail

can database be accessed without sharing the folder.

2 5411

Which is the best product for source controlling compair to VSS for vesion controlling

1 3290

When any person create a new file in the project, he will add it to the Source Control System in the correspoding to folder. This process is called "Checkin". Most of the source control systems provide a windows explorer like user interface. You can checkin files in different ways: 1. Drag and drop files from windows explorer to appropriate folder in source control explorer. 2. Go to appropriate folder in source control system, right click on the folder name and select 'Add Files'. This will launch a file browser which will allow you to select files. 3. Integrate with Visual Studio - most source control systems are integrated with Visual Studio when you install their client software. This is the easiest way to work with source control systems. When you right click on any file in the Solution Explorer in Visual Studio, it will give you the option to checkin or checkout files. After you add (checkin) a file to source control , the file is "controlled" by source control system. If anybody want to change the file (including the person who created the file), he has to "checkout" the file from Source control. When you checkin a file to source control, it will make the file in your computer 'Read only' so that you cannot edit it. This is to remind you that the file is controlled by source control system. You can add new files to source control, but you cannot checkin an existing file unless you have checked out that file.

2016

I checked in modified code into vSS . Now I have another working area and which has older version. Now I wanted to findout the difference between VSS and older version in another working area which is not the VSS area. Now the question is after getting difference between the VSS and another working area. There will be some files difference. How do I take only difference files recursively into some other area.

1725

I want to prepare a patch installation for my company. I need all the files which have been modified since Jan 09. I have taken the history of project in VSS, for date range 01Jan09 to today. Now whats the procedure of getting all those files to my local directory, which is being used for a patch install preparation. Thanks.

Accenture,

1754

Which DB using by Visulal Source Safe ? Can we assign our won database to VSS? or it have any default DB ?

Hexaware,

1859

What is Exclusive Checkout?

913

What is Multiple Checkout?

863

What is Merge Conflicts?

902

What is CaseComplete Files?

862

What are Package Files?

862

How to Structure and Partition your Project?

875

How to Create a New Shared CaseComplete Project?

959

How to Create a Working Folder for a Shared Project?

862

How to Put an Existing Model under Version Control?

801


Post New VSS Questions

Un-Answered Questions { VSS }

Does VSS 6.0 support NT’s built-in security?

819


How do I apply a label to an older version of a file?

880


Can we import data from sourcesafe into sourceanywhere?

402


How to Structure and Partition your Project?

875


How do I convert my PVCS archive to VSS?

1007






How to Create a Working Folder for a Shared Project?

862


How does one implement SourceSafe integration with FrontPage 2000/ 8?

873


How can I use SourceSafe to version stored procedures with Visual Studio 6.0 and SQL Server 7.0?

806


How do I display a custom message box during Add Item, Check In, Ckeck Out, Undo Checkout, Branch, and Rename?

880


What platforms can I automate VSS using OLE?

816


How do I reconnect a Visual C++ project after I have branched or shared it to a new location?

816


How can I access VSS from a remote site over the Internet directly of via a web portal?

830


Does VSS OLE Automation support administrative functions?

1033


How to Check In Changes?

919


How do I find all changes between two dates?

891