Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

COBOL Interview Questions
Questions Answers Views Company eMail

consider the following two statements MOVE 10 TO N PERFORM PARA-X N TIMES STOP RUN PARA-X MOVE 5 TO N how many times PARA-X willbe exicuted? a.10 b.5 c.infinate d.execution error

ABCL, TCS,

6 13998

given the following: 77 A PIC 9V9 VALUE 9.5 77 B PIC 9 VALUE 9. 77 C PIC V9 VALUE 0.8 77 D PIC 9 77 E PIC 9 77 F PIC 9V999 what are the contenta of D E nad F after the following statements are executed: COMPUTE F ROUNDED=A+C/B MULTIPLY A BY C GIVING E ADD B C A GIVING D ROUNDED a.F=9.589 E=8 D=1 b.F=9.589 E=8 D=9 c.F=9.589 E=7 D=9 d.F=9.589 E=7 D=1

Broadridge, TCS,

5 14250

A LESS 1200 IF B GREATER 25 MOVE 47 TOC ELSE MOVE 57 TO C IF A GREATER 249 MOVE 67 TO C ELSE NEXT SENTENCE ELSE IF B LESS 67 MOVE 27 TO C What will be the value of C, when A is 137 and b is 25

TCS,

3 6534

Consider the following: 77 W-NUM PIC 9 VALUE 0 ------ MOVE 1 TO W-NUM PERFORM PARA-X UNTIL W-NUM > 9. ------ PARA-X ADD 1 TO W-NUM How many times PARA-X is executed ?

Accenture, TCS,

14 24110

Consider the following code: 77 A PIC 99V99 VALUE 55.35 77 B PIC 99V999 VALUE 32.754 ADD B TO A ON SIZE ERROR DISPLAY "ERROR!!!" What will be the result ? (a) A=88.10, B=32.754 (b) A=87.00 B=32.754 (c) A=87.10 B=32.754 (d) ERROR!!! will be DISPLAYed on the screen.

TCS,

3 12315

Consider the following: 77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING C Which of the following is true ? (a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.

TCS,

4 8734

A paragraph PARA-X is to be executed when none of the data names A, B and C have value of 1. Which of the following will achieve this ? (a) IF A NOT = 1 OR B NOT = 1 OR C NOT = 1 PERFORM PARA-X (B) IF NOT A= 1 AND B= 1 AND C = 1 PERFORM PARA-X (C) IF A NOT =1 IF NOT B = 1 OR C= 1 PERFORM PARA-X (C) IF A NOT = 1 AND B NOT = 1 AND C NOT = 1 PERFORM PARA-X

TCS,

3 7058

Identify the invalid dataname from the following: (A) savings-account (B) annual-allocation-for-overhead (C) samount250 (D) 12demand

TCS,

4 7649

Study the DATA DIVISION entries and the three PROCEDURE DIVISION entries given below: 01 END-OF-FILE-SWITCH PIC XXX. 88 NO-MORE-RECS VALUE "YES". 88 MORE-RECS VALUE "NO". (i) READ SAMPLE-FILE AT END MOVE "YES" TO NO-MORE-RECS. (ii) IF NO-MORE-RECS = "YES" GO TO LAST-PARA. (iii) IF NO-MORE-RECS GO TO LAST-PARA. Which are wrong? (a) (i) and (ii) (b) (ii) and (iii) (c) (i) and (iii) (d) all

TCS,

5 8449

The following entries appear in the WORKING-STORAGE SECTION: 01 DATE-TODAY. 05 YY PIC XX VALUE "90". 05 MM PIC XX VALUE "12". 05 DD PIC XX VALUE :31". 01 DATE-EDIT PIC XX/XX/XX. MOVE DATE-TODAY TO DATE-EDIT. (a) 901231 (b) 90/12/31 (c) 31/12/90 (d) 311290

TCS,

4 8566

How many bytes will be allocated for the following record description entries? 01 REC-A. 05 A PIC S9(4). 05 B PIC XXXBXXX. 05 C PIC ____9.99. 05 D PIC S9(5) COMP-3. 05 E PIC 9(3) COMP.

IBM, TCS,

16 25581

What is wrong with the following data declaration? 01 W-DATE PIC X(6). 05 DD PIC 99. 05 MM PIC 99. 05 YY PIC 99. (a) Nothing is wrong. (b) Under W-DATE all level 05 items are having a PIC 99 but level 01 has PIC X(6). (c) PIC can't be specified for a group item. (d) DD, MM, and YY are invalid datanames.

Mphasis, TCS,

6 13520

What is the output generated by the following code? 01 GRP-I. 05 SUBFLD1 PIC XX VALUE "AB". 05 FILTER PIC X(6) VALUE SPACES. 01 GRP-2 REDEFINED GRP-1. 05 SUB-FLD2 PIC XX. 05 SUB-FLD3 PIC XX. 05 FILTER PIC X(4). IF SUB-FLD1 NOT = SPACES DISPLAY "SUBFLD1" MOVE "ABBCCD" TO GRP-1 IF SUB-FLD3 = SPACES DISPLAY "SPACES" ELSE DISPLAY "SUBFLD3" DISPLAY "END" ELSE DISPLAY "SPACES" DISPLAY "END". (a) SUBFLD1 SUBFLD3 END (b) SPACES END (c) SUBFLD1 END (d) SUBFLD1 SPACES

TCS,

7 10274

88 level entry is used for (a) data items in WORKING-STORAGE SECTION (b) items with RENAMES clause (c) condition-names (d) None of the above

TCS,

5 10915

ZEROES and SPACES are _______ constants (a) Figurative (b) Numeric (c) Non-numeric (d) Alphabete

TCS,

4 9187


Post New COBOL Questions

Un-Answered Questions { COBOL }

What is perform what is varying?

1187


Explain how to differentiate call by context by comparing it to other calls?

1197


please..could u give an example about USAGE IS POINTER ..and explain why and when we use it ?

2482


What is the difference between structured cobol programming and object alternativelyiented cobol?

1258


What is the difference between Call and a Link?

1209


Write a program to enter and display the names of students in a class using the occurs clause.

1223


How to remove the spaces at the end of each record in the output file of variable length, via cobol program?

1182


System Testing for Mainframe Developers What is System Testing? integration testing ? what's the procedure ..

2089


Write the code to count the sum of n natural numbers.

1224


What is inspect in cobol ?

1315


What is rmode(any) ?

1282


What is the difference between a binary search and a sequential search what are the pertinent cobol?

1148


What is a scope terminator give example?

1124


How to get the last record in vsam file in cluster? And how can you get the ksds file records into your cobol program?

1151


What are the access modes of START statement?

1282