With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
2462Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
1923Post New Power Plant Interview Questions
Which is better android nougat or oreo?
How does shell sort work?
What does int parse do in c#?
Two default user groups created in the repository are____and_____.
What are the sticky keys on a laptop?
What is lineage graph?
What is the function of the not null constraint?
What is a procedure in oracle?
Have you been a team leader in your previous or present job and what are the challenges of associated with team leadership?
List the ways to get the count of records in a table?
What is the symbol used for in c#?
What are interpolation and extrapolation?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
How do I open the run command?
Explain about varargs in java?