for a 132/33kv transformer secondary is star and is connected to NER. and from secondary a cable is running to 33kv swbd. since the cable is single core do i have to run neutral cable also to 33kv swbd.???
5 10441Post New PowerTech Interview Questions
How would you set up tomcat for remote debugging?
How is an iterator handled in ruby?
What is data control language (dcl)?
What is use of @repository in spring?
Explain me with all these caveats, what can I dye?
How to RD using transformer?
any one have amw(ASIAN MOTOR WORKS) QUESTION PAPERS OF PREVIOUS PLS SEND ME AT mahendra_yalavarthi@yahoo.com
How to open excel in vb script?
how to workable concrete cube test M-25 design mix
What are the reasons for process termination?
What is the difference between sql and isql*plus?
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
What is meant by conditional formatting?
Dear all, i completed M.E(Power Electronics & Drives) 2011 passed out having 78% so i need job in core side but i don't know how can i receive the calls from electrical companies and i uploaded my CV in naukri, times jobs etc.. In that iam not recieved any mails from good companies so give me best procedure plzzzzzzzzzzzzzzzzzzzzzzzz..... Thanks, K.Linga Reddy Email-id:-lingareddykmthm@gmail.com Ph no:-08015402078
How can I improve my excel skills?