Client traffic is being bridged trough LAN interfaces on two WLCs.Which roaming option will Keep them on the same IP Subnet ?
2 5073A remote user needs a static IP address to support a specific application.Which remote access VPN addressing technique supports this ?
2 7167Which two statements correctly identify considerations to take into account when deciding on campus QoS Design elements ?
1 51255. Which Two Settings must be configured in order to use the GUI to configure Call Admission Control with voice Applications
1 4214Post New Pari Networks Interview Questions
how to check the paths?
What is the physical representation for a many-to-many relationship?
What is meany by proxy server?
What is @enableautoconfiguration in spring boot? : Spring Boot
What remote access options does windows server 2003 support?
What makes a good test engineer?
How does the aosp relate to the android compatibility program?
Compare registered vs. Bearer debentures.
Lowest Common ancestor in a Binary Search Tree and Binary Tree.
What is beanpostprocessor in spring?
what are the Parts of ODBC?
Define Clone?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.
In asset accounting what are the organizational assignments?
What is resultset concur_updatable?