Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2040Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
2009Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1412Post New HMK Interview Questions
How will you check python version?
Is full outer join same as cross join?
tell something about yourself and the place you belong?
Ho do you troubleshoot server hang?
Why are material master records used in sap?
How to remove controller name in codeigniter?
What is meant by saying at what current is transistor biased?
Does the table of contents count as a page?
The size of shaper is specified by ?
Are threads independent?
How to do performance tunning a database in DB2 V8.2 UDB in linux
what is an industrial electronics engineer ? what he does ? what specialities and experties he should have ? what are the difference between industrial electronics engineer & electronics engineer & electrical engineer ?
What is the “__v” field in mongoose?
How to check the Bushings of the transformer?
Do I need a microsoft account to use outlook?