Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2037Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
2006Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1409Post New HMK Electrical Engineering Interview Questions
What is ctrl g in excel?
why is update statistics important to a database?
What is preparedstatement in java?
When is a binary search best applied?
Explain organogenesis?
What is infoobject catalog?
Can we override interface methods in c#?
what is t code of journal voucher report with amount?
What are columns and rows in word?
What is a joke that people say about you and how would you rate the joke on a scale of 1 to 10?
What are the various Labour standards in the fishing sector ?
How Plants modify themselves accoridng to the environment?
Apart from opening of a file do we have any other use of USROPN?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Can a synonym name of a table be used instead of a table name in a select statement?