Draw SLD feeding from the SS up to distribution board of the load, calculate cable size, breaker sizes, and meter for the following case: Ground Floor: electric room, pump room, 5 shops, each is 15 KW First Floor: 5 shops, each is 15 KW Second Floor: showroom 30 KW Service Loads: water pump 3 KW (3ph) , fire pump 3 KW (3ph), and one DB service 12 KW (3ph).
2037Draw an S.L.D of the main panel for a hospital, showing meter position. Essential loads are: 1) Equipment load 100 KW 2) Critical load 500 KW 3) Life AID Safety load 400 KW 4) NON-Essential load 200 KW 5) Other service loads 200 KW Calculate and suggest the size of the transformer, size of main cable, capacitor bank, and calculate the capacity of an emergency load having above first three mentioned loads is supplied by an emergency generator.
2006Give accurate definitions for these electric terms: Inductor Inductance Inductive Induction Reactance Reactive Esam Baraka ٢١ ساعة
1409Post New HMK Interview Questions
What is the difference between the internal module and the external module?
What are the tasks performed during postorder traversal?
Which is better hashmap or hashtable?
What are formatter plugins in cucumber?
Slab quantity
What is difference between Performance Management and Performance Appraisal?
What is Language Integrated Query (LINQ)?
Is desktop linux dead?
Is there a way to automate sql execution from the command-line, batch job or shell script?
Why we use #include iostream in c++?
What is route parameters in laravel?
What is the difference between html & html5?
What is a php class?
How will u call java method from flex?
Explain how the slides and specimens used as instructional resources?