how do u migrate BO 6.x to XI ?
Answer Posted / ganesh
hi this is simha,
there are 2ways to migrate 6x to xi.
1)open migrate wizard. IMPORT WIZARD window appears.
import wizard is a tool to migrate
reports,Universes,Repository objects to one environment to
other environment with in XI and and also from prior
versions to XIR2 versions.
2) while using this option, Report Conversion tool.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
is it possible to export the webi reports to crystal reports?with out using businessview?
What three things do you consider to be the most important factors for a manager?
Hi, I would like to know how is the integration if we want to use Oracle Essbase as the Cube Engine, and present the Cube by Business Objects Presentation Layer? Can Oracle Essbase be integrated with Business Objects? Thanks,
Regarding Hyperlinking in Business Objects. We have a few reports in QA environment where a number of hyperlinks are employed using OpenDoc function.In some of the reports,hyperlink is used to move to another tab within the same report.The formula used include "DocID" and ReportName="tab name".This works fine but now,for the PROD move,this will not work as the Doc Ids are subject to change. Is there a way to overcome this?Without DocID,how will move to a particular tab? Thanks in advance
Can we Save (save as) WEBI Doc as DESKI?
Is there any tool that can compare two unvs / two rpts , built using bo 5.1 / bo 6.5?
I have set of reports in BO4.0 and need to use "Hyperlink" functionality. I had to use native hyperlink functionality provided in BO4.0 but looks like it's available only in Rich Client.Currently,we have only Infoview B04.0 Launch Pad.Is OpenDoc the only hyperlink option on BO4.0 Launch Pad? Thank you.
what are the day to day activities of BO administrator ?
Explain which versions are used in the bo dashboard work?
What are all difference between business objects 6.5 and xi r2?
What is difference between custom hierarchy and report based hierarchy?
Explain what are the steps to be taken to schedule the report?
Give some information on report bursting?
What are all the points to keep in consideration, while we are migrating the Universes,Reports from BO5.1.6 to BO 6.5? Is is compatible to migrate like this? Does it effect the filters in Reports and Join in the Universe?