Answer Posted / rockey
cutover strategy: -its mean stop the old system and transfer old data in sap system. In this remove the dublicary and they clear the errors.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is workflow? Name the person who can assist you while configuring a workflow for a system.
Is anyone familiar with allocation run – Tcode is Arun_ITA?
what is the partner process ?
how to define and assign value for mini oder value (amiw) condition type and which field cateloge we suppose to choice in v/03?how amiw and amiz work together?
Is it possible to work without specifying a pick/pack or loading time for a shipping point?
Explain the interfaces you have worked on?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system
What is sap transport layer? : transportation management
How you can extent the rebate? What are the procedures, what is the customisation for it?
Does sap transportation management support optimized routing and last mile planning? : transportation management
During route determination the system also needs to know the departure zone of the goods to be shipped. How does this information come into the sales order?
what is the use of delivery and billing documents header and item
how to fill the GAPs in BBP?give me one example thanks in advance venkatesh
Can you deference between contract & scheduling agreement?
What is delivery document?