Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to sort an array in descending in RPG

Answer Posted / ravi kumar

DARR1 S 3S 0 DIM(5) DESCEND
C
C EVAL Arr1(1) = 100
C EVAL Arr1(2) = 500
C EVAL Arr1(3) = 300
C EVAL Arr1(4) = 400
C EVAL Arr1(5) = 250
C sorta arr1
C ARR1(1) DSPLY
C ARR1(2) DSPLY
C ARR1(3) DSPLY
C ARR1(4) DSPLY
C ARR1(5) DSPLY
C SETON lR

OUTPUT:
500
400
300
250
100

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the key words you must use when using a subfile?

1169


what happens when sflsiz = sflpag? What are the advantages and disadvantages?

1185


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2247


do you use message subfiles? What are the necessary keywords required coding a message subfile?

1122


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

1240


thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400

2309


How can we know running job is batch or interactive?

1113


what is the rpg system?

1268


what is an online rpg?

1255


If my rpg program has a date field, what extra care I have to take while compiling that rpg program? If the file is keyed and I have declared the file as well as key list properly in my program. Still am getting an error message like "chain/reade operation is not allowed" what may be the case?

1096


How to select highest score of each subject or how to select highest income of every month?

1756


can you debug ile rpg program using isdb?

1258


1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?

943


what is program status data structure?

2390


How to handle duplicate error handling in RPG?

2290