For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the
weight of sand and aggregate
Answer Posted / ranjithkumar.t
RATIO M15 1:2:4
CEMENT 1 Bag = 50 KG , Sand (River)=1840kg/cum,
Agg = 2850kg/cum
SAND =2/7
=0.285
=525 KG
AGG, = 4/7
=0.571
=1628kg
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
please send me bhel questions on rupesh.017@rediffmail.com
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
HOw much % of premium on DSR-2013 currently
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
pls mail some more tecnical qustions at msaranya2610@gmail.com
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
plz.show development and anchorage length in simple diagram.
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
can i get civil engineering test papers.......?????
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
material used for mendrel use to bend epoxy coated rebar
Why do you want to work here
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???