1.CA(command Atention key)& CF(command Function key)
difference with example?Please can any body tell me in real
time exp?
2.Can any body tell me some mandatery function keys using
while creating any screen with use of SDA-FUNCTION
kEYS?
Answer Posted / priya
CA does not retains the value into the buffer memory.
CF retains the value into the buffer memory.If we have
F3=Exit defined with CF in display File,in debug give F3 in
screen ,then it returns control to Debugging Program.For CA
,it comes out of debugging program.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
how can I tell when to replace the array?
how do I declare a minor?
thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400
how do you use commitment control in rpg?
what was the robotech rpg?
Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?
What is the difference between copybooks and subprocedures in as400?
what is kids-rpg?
what is the use of sflnxtchg?
how do I preserve and clean the array?
what is the difference between do while and do until?
What is a record lock error?
do you use message subfiles? What are the necessary keywords required coding a message subfile?
What is difference between bind by copy and bind by reference?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.