How to Explain My project flow,In TCS ased me this question.
In which way i can start my project flow and they asked how
many fact tables and dimensional tables u used. Can any one
Explain Briefly for this question and project architecture
also.. please..
Answer Posted / anuradha
we should fallow project flow like
1.requirements(like exiting system)
2.proposed system
3.designing(uml diagrams,flocharts)
4.coading()
5.testing
6.maintaining
7.most important thing you should explain what is your
contribution to develop the project.
8.u should analyze your project and make architecture.
| Is This Answer Correct ? | 25 Yes | 7 No |
Post New Answer View All Answers
What is sequence generator transformation in informatica?
Can we use the mapping parameter or variables developed in one mapping into any other reusable transformation?
What is pmcmd command?
How do you load only null records into target?
What is the difference between Active and Passive transformation?
I have worked on Informatica 7.1.1. I want to know the answer for the below question. Target is not created initially.Then how to take the DDL script from the source and run the Mapping by creating the Target dynamically?Is it possible by SQL Transformation?
What is meant by LDAP users?
Performance tuning( what you did in performance tuning)
How do you update the records with or without using update strategy?
Define mapplet?
what is persistent lookup cahce?how to use and when to use this persistent lookup cahce?explain?
What is expression transformation?
What are the types of schemas we have in data warehouse.
Which are the different editions of informatica powercenter that are available?
define galaxy repository in informatica